Every appropriation and every capital project from the adopted 2026 budget — searchable, sortable, and downloadable. Figures are exactly as printed on the township's budget form, with the source sheet on every row. For the big picture, head back to the visual overview.
Search or filter all 170 appropriation lines. Rows are grouped by functional area; use the sort to reorder within each group. Every figure is exactly as printed, including the official subtotal and total lines.
| Line item | FCOA? | CAPS? | 2026 | 2025 | Change | Source |
|---|
Source: Appropriations Schedule (Sheets 12–30), 2025 vs. 2026 columns
Beyond day-to-day operations, the township also plans bigger one-time projects — equipment, road work, building improvements — funded through a mix of cash (?), grants, and borrowing. A single line often bundles several smaller projects within that department.
Sources: Capital Budget 2026 (Sheets 40b–40b1) and 6-Year Capital Program (Sheets 40c–40c1)